Physical collection
Digital collection
Serial collection
Login
Physical collection
Digital collection
Serial collection
Login
Back
Add bookmark
Share
Facebook
X (Twitter)
WhatsApp
Download QR code
Scan to view on phone
Close
Optimasi jumlah tenaga kerja dan kapasitas mesin di PT. Sarana Surya Sakti
Santosa, Agus Chandra
Additional author
Not available
Publisher
Madison Square Press
Year of publication
2000
Publication place
Surabaya
Language
(ind) Indonesian
ISBN
Not available
Series
Tugas akhir
Edition
Not available
Subject
PRODUCTION PLANNING
Note
Not available
Abstract
Not available
Number of pages
xviii, 154 p.
Dimension
30 cm
Other description
ill.
Summary / review / table of contents
Not available
Copies
Access no.
Call number
Location
Status
00898/00
((T)) 658.5 San O
Library - 8th Floor
Available
Similar collections by subject
Product strategy and management
Baker, Michael
Manufacturing planning and control systems
Vollmann, Thomas E.
Manufacturing planning systems
Scott, Bill
Inventory management and production planning and scheduling
Silver, Edward A.
Manufacturing planning and control for supply chain management
Jacobs, F. Robert
Mastering lean product development: a practical, venet-driven process for maximizing speed, profits, and quality
Mascitelli, Ronald
Perancangan sistem PPIC air mineral di PT. X
Widya, Ferdian Rama
Improvement proses, screwing pada lini kaleng kopi di PT. Sinar Djaja Can
Sutjiono, Billy
Business process improvement workbook: documentation, analysis, design, and management of business process improvement
Harrington, H. James
Perancangan produk
Ginting, Rosnani
Close
Download QR code
Your download will start shortly, or you can right click on the image and choose "Save as".