Physical collection
Digital collection
Serial collection
Login
Physical collection
Digital collection
Serial collection
Login
Back
Add bookmark
Share
Facebook
X (Twitter)
WhatsApp
Download QR code
Scan to view on phone
Close
Studi pengaturan frekuensi generator (Governor) di PLTA Selorejo 5600 kVA
Sidauruk, Rio Pandapotan
Additional author
Not available
Publisher
Not available
Year of publication
2004
Publication place
Surabaya
Language
(ind) Indonesian
ISBN
Not available
Series
Tugas Akhir
Edition
Not available
Subject
HYDROELECTRIC POWER PLANTS
Note
Not available
Abstract
Not available
Number of pages
xii, 90 P.
Dimension
30 cm.
Other description
ill.
Summary / review / table of contents
Not available
Copies
Access no.
Call number
Location
Status
02510/04
621.312134 Sid S
Library - 8th Floor
Under maintenance
Similar collections by subject
Pembangunan pembangkit listrik tenaga mikrohidro tipe MdCCF di saluran irigasi
Indonesia. Departemen Permukiman dan Pengembangan Wilayah
Pembangkit listrik tenaga air
Dandekar, M. M.
Proyek PLTA: risalah studi kelayakan investasi
Rewu, Oddang
Perancangan dan pembuatan turbin air sebagai pembangkit listrik 750 watt pada sungai hidrokinetik
Brian, Januard
PLTMH (Pembangkit Listrik Tenaga Mikro Hidro): panduan lengkap membuat sumber energi terbarukan secara swadaya
Nugroho, Hunggul Y. S. H.
Studi pengoperasian dan perawatan PLTA Selorejo 5600 kVA
Mulyanto, Dhanny
Hydro power: the design use, and, function of hydromechanical, hydraulic, and electrical equipment
Raabe, Joachim
Close
Download QR code
Your download will start shortly, or you can right click on the image and choose "Save as".