Physical collection
Digital collection
Serial collection
Login
Physical collection
Digital collection
Serial collection
Login
Back
Add bookmark
Share
Facebook
X (Twitter)
WhatsApp
Download QR code
Scan to view on phone
Close
Improvement proses, screwing pada lini kaleng kopi di PT. Sinar Djaja Can
Sutjiono, Billy
Additional author
Not available
Publisher
Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra
Year of publication
2018
Publication place
Surabaya
Language
(ind) Indonesian
ISBN
Not available
Series
Skripsi
Edition
Not available
Subject
PRODUCTION PLANNING
Note
Appendix: p. 53-57
Abstract
Not available
Number of pages
xii, 57 p.
Dimension
30 cm.
Other description
ill.
Summary / review / table of contents
Not available
Copies
Access no.
Call number
Location
Status
01434/18
((T)) IND 2105
Library - 8th Floor
Available
Similar collections by subject
Production planning and inventory control: berdasarkan pendekatan sistem terintegrasi MRP II dan JIT menuju manufakturing 21
Gaspersz, Vincent
Manufacturing planning and control systems
Vollmann, Thomas E.
Facility design and management handbook
Teicholz, Eric
Evaluasi pasca implementasi sap pada departemen PPIC PT. X
Sugianto, Jessica
Perbaikan lini produksi untuk peningkatan kapasitas pada PT. XYZ
Santoso, Stefanus
Manufacturing planning and control for supply chain management: the CPIM reference
Jacobs, F. Robert
Manufacturing resource planning (mrp ii): with introduction to ERP, SCM, and CRM
Sheikh, Khalid
Manufacturing planning and control for supply chain management
Jacobs, F. Robert
Mastering lean product development: a practical, venet-driven process for maximizing speed, profits, and quality
Mascitelli, Ronald
Perancangan sistem PPIC air mineral di PT. X
Widya, Ferdian Rama
Close
Download QR code
Your download will start shortly, or you can right click on the image and choose "Save as".