Physical collection
Digital collection
Serial collection
Login
Physical collection
Digital collection
Serial collection
Login
Back
Add bookmark
Share
Facebook
X (Twitter)
WhatsApp
Download QR code
Scan to view on phone
Close
Desain pengurangan lead time siklus kontrainer untuk mempercepat perputaran stok kontainer di PT X
Heryanto, Roby
Additional author
Not available
Publisher
Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra
Year of publication
2018
Publication place
Surabaya
Language
(ind) Indonesian
ISBN
Not available
Series
Skripsi
Edition
Not available
Subject
TIME STUDY
Note
Appendix: p. 64-84
Abstract
Not available
Number of pages
xiv, 84 p.
Dimension
30 cm.
Other description
ill.
Summary / review / table of contents
Not available
Copies
Access no.
Call number
Location
Status
01437/18
((T)) IND 2110
Library - 8th Floor
Available
Similar collections by subject
Motion and time study
Niebel, Benjamin W.
Motion and time study
Niebel, Benjamin W
Motion and time study design and measurement of work
Barnes, Ralph M.
Motion and time study: improving productivity
Mundel, Marvin E.
LKP : perusahaan mie cap burung elang Jl. Rantauan Darat 12 Banjarmasin 70243
Surjani, Lilis
LKP : penghitungan waktu baku dan efisiensi operator di PT Wonojati Wijoyo
Setiawati, Anita
LKP : proses produksi di PT Supra Aspindo Jaya
Mario A.H.K.
Motion and time study for lean manufacturing
Meyers, Fred E.
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi stock preparation 5 & 7 PT. Suparma Tbk
Septianti, Rika
Perbaikan lintasan CU dengan metode line balancing di PT. XYZ
Erwanto, Intan Mei
Close
Download QR code
Your download will start shortly, or you can right click on the image and choose "Save as".